Are you in the market for a kitchen makeover and don’t know how or where to begin? Alair Homes Forest Hill Toronto has the 3 keys to the transformation of your old kitchen.

Whether you need a custom built kitchen or you’re interested in kitchen renovations we’ve formulated everything you need from concept to completion:

The 3 Keys To Your Kitchen Upgrade:
1. Plan
2. Prepare
3. Perform

1. PLAN:

Gather every resource you can on the subject of a kitchen renovation and don’t be limited to local sources. From magazines to online search engine results look up information and document everything that you want and/or need. Make sure to record prices and the timespan for installation so that you can estimate your budget and time needed for your custom built kitchen.

Striving to balance function with aesthetics is important and satisfying when achieved in design.
What are your needs? How many people will be in the kitchen cooking? Will there be enough space to maneuver around comfortably?

After you have researched materials and time you can begin to search for a contractor with confidence. It must be a professional to ensure that the job is done right. When searching for the right company make sure you’re dealing with a reputable one with a track record that can be verified. Check out comments and ratings of all candidates. Do your homework be before you begin construction of your custom built kitchen.

 

2. PREPARE:

Contact contractors and get estimates. Shop around for at least 3 estimates before you decide on 1 and remember cheaper isn’t better. Before you contact any professional write down any and all questions you may have so that you have the most beneficial experience. Once you’ve chosen your contractor, make sure to clean out your kitchen completely to make the process easier. Be involved in every aspect of your renovation from appliances to the cabinets. Make sure to inquire on budget and time span before beginning the renovation.

Premium Selection Of Finishes And Fixtures Include:

Light fixtures
Flooring
Backsplash
Decorative hardware
Cabinets
Countertop material
Refrigerators and other appliances
Kitchen sink and faucet

3. PERFORM:

Demolition day is always exciting even if it isn’t your first one. Allow yourself between 4-8 weeks for the construction to be completed from permit submission to completion. The most important factor to consider is communication. Speak with your contractor and strategize before any aspect of the job begins. Have routine meetings to track your progress and budget.

Check List:
Order the Cabinets
Appliances
Lighting Fixtures
Gut the Kitchen
Electrical and Plumbing
Install Cabinets
Countertops
Appliances
Flooring
Fixtures

What To Expect

Move out if you want some don’t want to deal with the mess and the noise. Staying can offer some benefits especially for the final step of the process which is to double check your list of expectations.