One of the most important parts of starting a new construction project is to determine the timeline. The schedule will influence when you can move in or enjoy using a new part of your home. If you want to create a realistic construction timeline that is accurate and doesn’t leave you frustrated, Alair Homes Grey Bruce offers a few important tips to follow.

Do Your Homework

Researching is a critical component to creating a timeline that won’t result in unexpected events. Find inspiration by browsing magazines or the Internet while working with a professional designer. You can collect different pictures to hand over to the contractors and determine what will set the tone of the setting.

Most people are surprised to learn how much time it takes to weigh different options and select various materials or hardware, which is why you’ll need to plan for several months to avoid making mistakes. Certain products may be out of stock or are not what you envisioned once they arrive.

Create a Timeline

Creating a timeline will require you to plan for the project to have delays, especially in the beginning. There may be situations where the building process starts at a later date due to materials or products that haven’t arrived yet. The design phase typically takes two months for a single room and four to six months in multiple rooms.

One week to one month of this time should be set aside for requirements and building codes when you need to consult with experts who show up to the property. Each room will need to be measured to ensure that everything is built and completed correctly.

The shopping process is an additional step that takes longer than you may anticipate. You’ll need an average of two weeks to three months to obtain furniture pieces, finishes, and various materials. You can expect to return a few items or change your mind on the purchases that you make when talking to tradespeople.

Photo by Alair Homes Grey BruceDiscover exterior home design inspiration

Plan the Construction Timeline

You’ll need to give the timeline more months than you think due to changes that are often made throughout the entire process. From mold that is found in between the walls to a chandelier that is back ordered, several factors can push back the completion date and will require your patience.

Expect all of the products to take one to six months to be delivered depending on if they’re coming from another part of the country or internationally. The actual process will then take one to six months to complete, which is influenced by the size and details of the project.

Add a Buffer

Extra time needs to be added due to delays that can occur and are extremely common once the project begins. At least two months should be added to your timeline for emergencies or holidays. The two month period will cover snags that are prone to occur, which can include having to wait for the backsplash to be installed once the cabinets arrive.

Adding additional time to your timeline for unexpected events will allow you to remain patient and make the necessary plans on when you can move back in. You also will avoid having tension or becoming frustrated by understanding what can occur during the process.