Whether you’re building your own home or an office, the amount of time for construction can fluctuate depending on the time of the year and delays that can occur. For many people, it can be challenging to make a realistic timeline. Here are a few tips from Alair Homes Toronto to create your home project timeline.

Create Time for Research

Renovating your home or building a new house will take plenty of time due to research. You’ll need to find inspiration for the design and determine which features will increase the functionality of the setting. Avoid rushing the process, which can cause you to regret certain decisions that you make. Rushing through the planning process can often be expensive or out of your budget, making it difficult to make any changes.

Create a Design Phase Timeline

The design phase is typically two to six months due to the number of decisions needed. Single rooms need two months of planning and can also be extended due to building codes or requirements by the city. Shopping for the materials will also require two weeks to six months when working with tradesmen or comparing different styles.

Photo by Alair Homes TorontoDiscover exterior home design inspiration

Add a Buffer Timeline

Many people make the mistake of failing to add a buffer timeline due to delays throughout the process. There may be delays due to when certain products arrive or issues that are discovered behind walls. These delays will push back the completion date of the progress and will require you to be patient. Add two extra months to your timeline for delays to avoid moving in too early or if you want it completed by a certain month.

Plan for Several Months of the Construction Phase

The construction phase takes an average of three months to complete. This includes one month to have materials delivered or tearing down walls in older buildings. Two months of buffer time is needed to prepare for mistakes that can occur. Materials can often become damaged, or certain products are not what you ordered, making it necessary to leave room for correcting issues.

Obtain Building Permits

Building permits are needed to perform different types of work on the building, whether you’re creating a basement or are building an additional room. You’ll also need to create a realistic budget and make a list of any obstacles that you may face to ensure that you can get an idea of how long the project will take.

Create an Accurate Budget

Creating a budget that is accurate will avoid headaches and can prevent delays to make sure that you can afford each part of the project. You’ll need to set up a consultation with a professional to determine how much you can expect to pay from beginning to end.

The budget will also need to have money set aside for unexpected costs that can arise or changes that need to be made. You’ll avoid any sticker shock once you receive the final amount that you owe by planning for each expense that will be included in the process. It’ll also make it easier to ensure that you can complete the entire project because you’ll have the necessary funds to cover everything instead of stopping halfway through.